Challenge: Redesign a warehouse facility to accommodate state‐of‐ the‐art high tech manufacturing. The existing facility needed massive updating – new interior and half of the roof replaced plus new utilities to the building and an interior designed and built for machinery much more valuable than the building.
Solution: Knowing the massive remodel combined with the sophisticated nature of the equipment (the real tenant of the space) would cause many unforeseen challenges DBaC used focused and committed supervision to identify problems before they were problems. Our supervision was intense with out most senior Project Manager was on site every day working with a dedicated Project Manager.
Result: A state‐of‐the‐art facility completed and producing on time and above the client’s expectations
Quote: “DBaC performs above our very high expectations and does things for us that no other general contractor would do. We continue to value them as our contractor of choice”