Somers oversees a seasoned project management and supervision team while handling some of DBaC, Inc’s most important clients. With over 20 years at the company John has turned anticipating the needs of our team, subcontractors and clients into an art all while attacking obstacles as they arise with his straightforward, no-nonsense style.


Creative Office Experience

The Enthusiast Network (TEN)

Combined Contract Amount: $3.1M
Construction Type: 50,000sf 2 floor building remodel for new corporate offices. Facility included creative office space, photo studio, operational Auto Maintenance Garage.

Wet Seal

Combined Contract Amount: $1.2M
Construction Type: 30,000 sf full building remodel for Corporate Headquarters. Project included general office areas, photo studio, and sample rooms.

Laguna College of Art + Design

Contract Amount: $1.6 Million
Construction Type: 7,500 sf full building remodel for noted art and design school. Project included general office areas for the college.


​Traditional Office Experience

Young’s Market

Combined Contract Amount: $10.7M
Construction Type: 74,000 sq.ft. build out for Young’s Markets new corporate offices. Project included full commercial kitchen, three bars, rooftop garden and high end executive office suites. Project also involved a complete remodel of the site, replacement of the parking lot with a new concrete lot, and a new decorative plaster building facade.

Pfizer

Contract Amount: $ 1.9 Million
Construction Type: 28,000 sq. ft. Tenant Improvement. Involving three floors in a high rise building including a stairwell to connect all three floors.


​Industrial Experience

CWT Logistics

Contract Amount: $1.7 Million
Construction Type: 50,000 sq.ft. office and warehouse project. Project included high pile stor-age for parts and conveyer systems for shipping.

Applied Medical Warehouse

Contract Amount: $ 2.1 Million
Construction Type: 145,000 sq. ft. warehouse project. Project included high pile storage, air conditioning, conveyer systems and quarantine areas.


​High Tech Manufacturing Experience

Applied Medical

Combined Contract Amount: $81.3 Million (2003 – present)
Construction Type: Built out multiple manufacturing areas for all aspects of their production of both metal and plastic instruments. Built out clean rooms, office space, commercial kitchen, lunchroom and dining facilities.


​Site Work Experience

Option One Discovery Center

Contract Amount: $5.8 Million
Construction Type: Shell build out of four buildings (approx. 250,000 sf.) including a 6,000 sq. ft. data center and exterior generator enclosure.

Pacific Life Foothill

Contract Amount: $4.9 Million
Construction Type: 125,000 sq.ft. Tenant Improvement. Build out of two office buildings with an enclosed bridge connecting the two structures. Also built out a 1500 KW generator enclosure for backup.


​R&D Clean Room Experience

Applied Medical

Combined Contract Amount: $81.3 Million (2003 – present)
Construction Type: Built out multiple manufacturing areas for all aspects of their production of both metal and plastic instruments. Built out clean rooms, office space, commercial kitchen, lunchroom and dining facilities.

West Coast University

Contract Amount: $2.9 Million
Construction Type: 32,000 sq. ft. tenant improvement involving four floors with classroom, lab space, and office use for their corporate campus in Anaheim.

CoreValve

Contract Amount: $3.3 Million
Construction Type: Lab and Clean room production.